Which term refers to a site from which fill material is excavated for use elsewhere in a project?

Cut section

Fill section

Borrow pit

A borrow pit is the site where earth is excavated to supply fill material used elsewhere in the project. This term is used because the material is "borrowed" from one location to be placed in another to raise or level ground, build embankments, or fill depressions. In contrast, a cut section refers to material removed from the ground in place to achieve a lower profile at the origin site, not for use elsewhere. A fill section is where material is placed to raise the ground, which is the destination rather than the source. A slope stake is simply a survey marker used to establish and check the slope, not a source of material.

Slope stake

Next question

Find the option that is right for you!

All options are one-time payments.

$12.50

30 day premium pass

All the basics to get you started

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 30 day premium pass access
👑$30.00 $87.50 usd

6 month DELUXE pass (most popular)

Everything with the 30 day premium pass FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • Everything included in the premium pass
  • $87.50 usd value for $30.00! You save $57.50!
  • + Access to the ultimate digital PDF study guide
  • + 6 months of premium pass access
  • + Priority support
$12.50 $18.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy